期刊目次

加入编委

期刊订阅

添加您的邮件地址以接收即将发行期刊数据:

Open Access Article

Advances in Constructional Engineering. 2025; 5: (4) ; 68-70 ; DOI: 10.12208/j.ace.2025000143.

Strategies for synergistic control of construction progress and cost in housing construction projects
房建工程项目施工进度与成本协同控制策略

作者: 陈水云 *

江西万全建设工程有限公司 江西上饶

*通讯作者: 陈水云,单位:江西万全建设工程有限公司 江西上饶;

发布时间: 2025-04-12 总浏览量: 21

摘要

房建工程项目施工进度与成本相互影响、相互制约,实现两者协同控制是提升项目经济效益与竞争力的关键。当前房建工程在进度与成本控制上存在计划欠科学、方法落后、缺乏协调等问题。围绕确立协同控制目标,从计划管理、资源配置、动态监控、技术创新等方面制定策略,并构建组织、制度、技术保障体系。旨在为房建工程提供有效协同控制路径,推动行业管理模式优化升级,适应市场竞争与行业高质量发展需求。

关键词: 房建工程;施工进度;成本控制;协同管理;控制策略

Abstract

The construction progress and cost of housing construction projects are interrelated and mutually restrictive. Achieving synergistic control between these two aspects is crucial for enhancing the economic benefits and competitiveness of the project. Currently, there are issues with the scientific planning, outdated methods, and lack of coordination in the control of construction progress and cost in housing construction projects. To establish synergistic control objectives, strategies are formulated from aspects such as planning management, resource allocation, dynamic monitoring, and technological innovation, and an organizational, institutional, and technical support system is established. The aim is to provide effective synergistic control pathways for housing construction projects, promote the optimization and upgrading of industry management models, and meet the demands of market competition and high-quality industry development.

Key words: Housing construction projects; Construction progress; Cost control; Synergistic management; Control strategies

参考文献 References

[1] 张峻华.关于高速公路房建工程施工管理的研究[J].大众标准化,2024,(19):74-76.

[2] 吴大霞.精细化管理在房建工程管理中的应用研究[J].建筑与预算,2024,(08):10-12.

[3] 赵铁成.房屋建筑工程加强施工管理的策略探究[J].质量与市场,2024,(05):90-92.

[4] 张兴辉.基于SEM的房建项目施工进度影响因素及策略研究[J].项目管理技术,2023,21(05):160-164.

[5] 李鹏.BIM技术在房建工程施工中的研究及应用核心探索[J].中国住宅设施,2021,(08):113-114.

[6] 杜巍.BIM在房建项目管理中的应用思考[J].中小企业管理与科技(中旬刊),2021,(06):181-182.

[7] 漆红兰.BIM技术在房建工程项目施工建设中的应用实践[J].中国标准化,2021,(10):61-62+65.

[8] 李珉.影响房建工程项目管理的因素及解决措施[J].房地产世界,2021,(06):122-124.

引用本文

陈水云, 房建工程项目施工进度与成本协同控制策略[J]. 建筑工程进展, 2025; 5: (4) : 68-70.