Open Access Article
Advances in Constructional Engineering. 2022; 2: (2) ; 26-29 ; DOI: 10.12208/j.ace.20220036.
Research on promotion and development strategy of passive ultra-low energy consumption buildings
高校基建项目建设全过程工程造价控制探索与研究
作者:
赵静怡 *
湖北工业大学 湖北武汉
*通讯作者:
赵静怡,单位:湖北工业大学 湖北武汉;
发布时间: 2022-08-02 总浏览量: 435
PDF 全文下载
引用本文
万方数据(WANFANG DATA)
摘要
近年来,高等院校重点学科建设和院校招生范围逐渐增加,教学科研场所也相应增加,所以高校基建项目数量增多。高等学校基建工程项目建设主要使用国家财政资金,而如何以最有限的资金投入建成最好的质量、相对于最低费用的工程,并取得最大的效益,是高等院校基本工程建设工作好坏的一个重要权衡指标。
关键词: 高校;基建;全过程;工程造价控制
Abstract
In recent years, the construction of key disciplines in colleges and universities and the scope of enrollment in colleges and universities have gradually increased, and the number of teaching and research sites has also increased accordingly, so the number of infrastructure projects in colleges and universities has increased. The construction of capital construction projects in colleges and universities mainly uses national financial funds, and how to use the most limited funds to build projects of the best quality, relative to the lowest cost, and obtain the greatest benefits, is the quality of the construction work of colleges and universities. an important trade-off.
Key words: Universities; Infrastructure; Whole process; Project cost control
参考文献 References
[1] 工程设计阶段的造价控制策略[J].赵宇.门窗.2014(02)
[2] 简述建设工程设计阶段造价管理的重要性及控制方法[J].严静.科技信息.2013(24).
[3] 康凯. 建设项目设计阶段工程造价控制研究[D].南昌大学,2018.
[4] 王志涛.建筑工程设计与工程造价有效控制分析探讨[J].黑龙江科技信息.2011(15)
引用本文
赵静怡, 高校基建项目建设全过程工程造价控制探索与研究[J]. 建筑工程进展, 2022; 2: (2) : 26-29.